Small and Condo Bathroom Renovations in Aurora
Short answer
Small and condo bathroom renovations make the most of compact 5 x 8 ft rooms using wall-hung vanities, recessed storage niches, clear frameless glass and large-format porcelain, while handling all condo board approvals and elevator bookings. In Aurora, a compact 5 x 8 ft bathroom ranges from $9,200 to $22,600 all-in depending on finish tier.

Making every inch count in a 5 x 8 ft bathroom
Are you looking to make the most of a compact 5 x 8 ft hall bathroom or condominium suite in Aurora? In a small bathroom, half an inch determines whether the hallway door clears the vanity corner or whether a drawer pulls open past the toilet bowl. Before you order a single fixture, our team measures the room and prepares scaled layout drawings so you can check door swing, toilet clearance, vanity depth and storage capacity on paper.
Across Aurora, the small bathrooms we remodel most frequently fall into four categories:
- Condominium suites and stacked townhomes along Yonge Street, Wellington Street and Bayview Avenue, where drain traps sit inside the concrete floor slab and building management sets strict work hours.
- 5 x 8 ft three-piece hall bathrooms in 1950s–1970s bungalows and split-levels across Regency Acres, Aurora Village and Aurora Heights.
- Main-floor two-piece powder rooms where homeowners want a floating vanity, stone countertop and backlit mirror.
- Lower-level three-piece basement bathrooms framed beside a furnace room or laundry area.




Seven design moves that open up a compact Aurora bathroom
- Install a wall-hung floating vanity. Showing 8 to 10 inches of continuous floor tile underneath the cabinet makes a narrow room read wider and leaves floor clearance for a scale or step stool.
- Recess storage niches between the wall studs. Built-in shower niches and recessed medicine cabinets store toiletries inside the stud bay instead of jutting into your elbow space.
- Swap curtains for clear 10 mm frameless glass. Replacing a fabric curtain or thick aluminum bypass track with clear glass lets your eye travel all the way to the back wall of a walk-in shower.
- Use large-format porcelain on the floor and walls. Fewer grout lines make a tight room feel calmer; running the same porcelain across the main floor and into the shower pan stretches the visual footprint.
- Carry wall tile right to the ceiling. Stopping tile 12 inches below the ceiling cuts a room in half; tiling full height draws the eye upward.
- Pick compact-depth vanities and one-piece toilets. An 18-inch-deep vanity or a compact elongated skirted toilet adds precious walkway room in a 5-foot-wide bath.
- Layer perimeter LED mirrors with recessed pot lights. Windowless condo bathrooms and interior hall baths feel twice as bright with shadow-free mirror lighting and wet-rated ceiling pot lights.
What a small or condo bathroom costs in Aurora
For a compact bathroom around 5 x 8 ft, our published all-in budgets (combining installation labour and finish materials) are:
| Bathroom size | Finish level | All-in range |
|---|---|---|
| Small bathroomabout 5 x 8 ft | Straightforward refresh | $9,200 to $12,300 |
| Full rebuild with upgraded finishes | $18,500 to $22,600 |
Labour and materials together, in CAD before HST. Updated November 7, 2026.
For a 7 x 9 ft three-piece bathroom with a new tub, porcelain tile, vanity with quartz top, exhaust fan, pot lights and glass tub door, our published labour package starts at $8,000 prior to finish materials. In a multi-unit condominium building, site labour can run slightly higher than in a detached house because tools, tile boxes and disposal bags travel through reserved service elevators during shorter weekday work windows. See our Aurora bathroom renovation cost page for full package and line-item tables.
How we coordinate Aurora condominium renovations
When you renovate inside a condominium building along Yonge Street, Wellington Street or Bayview Avenue, the concrete slab, main plumbing stacks and hallways are shared common elements. Here is how we work with your property manager and condo board:
1. Suite alteration package and contractor certificates
Prior to scheduling demolition, property management requires a completed alteration agreement. We supply a written scope of work, plumbing and electrical specifications, our current WSIB clearance certificate, and our commercial liability insurance certificate naming the condominium corporation.
2. Service elevator bookings and corridor protection
Once board approval is issued (typically one to three weeks), we book the padded service elevator and loading zone for demolition haul-away and material delivery, and lay protective runners from the suite entry door to the bathroom.
3. Respecting weekday noise bylaws
Condominium rules restrict noisy tasks—tile removal, masonry drilling and wet-saw cutting—to weekday daytime hours, usually 9 am to 5 pm. We sequence our trades so the renovation progresses smoothly within those approved hours.
4. Concrete floor slabs and existing drain footprints
Because drain traps in a condo building are cast into the concrete slab or run inside the ceiling space of the suite below, condo boards rarely permit moving a toilet or shower drain. By keeping the fixtures on their existing slab drains and upgrading to a curbless or low-curb walk-in shower, floating vanity and custom glass, we remodel the bathroom without structural core drilling or municipal plumbing permits; see our article on Aurora bathroom renovation permits.
Read our condo walk-in shower and powder room case study
To see how a multi-room condo remodel comes together within concrete slab constraints, read our condo shower and powder room case study, where we installed a frameless glass walk-in shower with veined marble porcelain and brushed brass hardware alongside a matching powder room upgrade.
Ready for an itemized written price? Upload a few photos of your bathroom (and your building’s alteration rules if you live in a condo) on our free quote page. Every project is backed by our written labour warranty.
Before and after
Real projects of this type. Drag the slider to compare.




Related projects

GTA project
Frameless glass walk-in shower with ceiling rain head and marble bench
A compact 3-piece bathroom converted to a bright walk-in shower featuring 10 mm frameless glass, a flush ceiling-mounted rainfall head, a built-in marble slab bench, a tall contrasting niche and large-format veined porcelain.

GTA project
Condo walk-in shower and powder room upgrade with brushed brass hardware
A multi-bathroom condo renovation featuring a frameless glass walk-in shower with veined marble porcelain and brushed brass fixtures, paired with a compact powder room vanity and backlit mirror.

GTA project
3-piece bathroom rebuild with charcoal floating vanity and hex-mosaic shower
A dated 3-piece main bathroom gutted to the studs and finished with a glossy charcoal floating vanity, LED mirror, textured white shower wall tile, grey-and-black hexagon mosaic pan and matte-black fixtures.
Small & Condo Bathrooms: common questions
What paperwork do Aurora condominium managers ask for before a bathroom remodel?
Property managers typically ask for a signed alteration agreement, our detailed scope of work, a current WSIB clearance certificate, a commercial liability insurance certificate naming the condo corporation, and elevator booking dates. We prepare and send our contractor documents as soon as your project is booked.
How can you make a compact 5 x 8 ft hall bathroom feel more spacious?
Using a wall-hung vanity so floor tile continues underneath, swapping a fabric shower curtain for clear tempered glass, recessing storage niches between the wall studs, and running bright large-format porcelain up to the ceiling make a 5 x 8 ft room feel noticeably wider without moving a single wall.
Other bathroom services

Full Bathroom Renovation
Taken down to the studs and rebuilt with new plumbing, waterproofing, porcelain tile and fixtures.

Walk-in Showers
Custom tiled walk-in and curbless showers with frameless glass, niches, benches and linear drains.

Tub-to-Shower Conversion
Replace an unused alcove or corner bathtub with a spacious, easy-entry tiled walk-in shower.

Bathtub Replacement
Deep alcove soaker tubs, corner whirlpool removals and freestanding tubs with waterproofed tile surrounds.

Basement Bathrooms
Three-piece basement bathrooms built on existing rough-ins or with new drains trenched through the slab.

Accessible Bathrooms
Step-free curbless showers, fold-down seats, reinforced grab bars and comfort-height fixtures.

Bathroom Repairs
Ceiling water stains, leaking shower pans, attic fan ducts, mould and fixing unfinished contractor work.