Bathroom Renovation Cost in Aurora (2026)
Published Aurora labour packages, size-by-size all-in renovation budgets, individual trade line items, and the layout decisions that change your total cost.

Short answer
Our published Aurora labour packages start at $8,000 for a 7 x 9 ft main bathroom with a new bathtub, $11,500 for a 9 x 12 ft four-piece ensuite with a curbless shower and relocated drains, and $15,000 for a 15 x 8 ft wet room. Finish materials are billed separately. All-in with mid-range finishes, a typical hall bathroom averages around $14,000 and a full primary ensuite $30,000 or more.
When you start thinking about a bathroom renovation in Aurora, one of the first questions on your mind is how much the project will cost. Most renovation companies keep their pricing hidden until an estimator comes to your home, which makes it hard to know where your budget stands. We publish the exact starting figures we use to build our written estimates—in Canadian dollars before HST—so you can plan your project with clear numbers from the start.
The tables below show two sets of numbers. Labour packages cover our complete on-site construction and trade work: floor protection, demolition, disposal, rough plumbing, electrical, framing, waterproofing, tile setting and fixture installation. All-in ranges pair that installation labour with typical mid-range finish materials (porcelain tile, tub or shower glass, vanity cabinet, quartz counter, faucet and toilet) to show total project budgets.
Published labour packages
These three packages match the residential bathroom layouts we renovate most frequently across Aurora. Every package lists the exact construction scope included so you can compare it line for line against any other estimate.
| Bathroom | What's included | Labour from |
|---|---|---|
| Main bathroom with new tub7 x 9 ft |
| $8,000 |
| 4-piece primary ensuite with curbless shower9 x 12 ft |
| $11,500 |
| Wet room with shower and jetted tub15 x 8 ft |
| $15,000 |
Labour and installation only; finish materials (tile, tub, fixtures, vanity, glass) are extra. Prices in CAD before HST, updated November 7, 2026.
The $8,000 (7 x 9 ft) package fits the classic upstairs hall bathroom or main-floor bungalow bath found across Regency Acres, Aurora Village, Aurora Heights and Aurora Grove, keeping the tub, toilet and vanity in their existing positions. The $11,500 (9 x 12 ft) package matches the four-piece builder primary ensuite common in Bayview Northeast, Bayview Wellington and Bayview Southeast, where an unused corner whirlpool deck and small stall shower are removed to build a curbless walk-in shower and double vanity. The $15,000 (15 x 8 ft) wet-room package is built for larger primary suites in Aurora Highlands, Hills of St. Andrew and Aurora Estates—similar to our freestanding tub and pebble-floor primary bathroom case study—where the soaking tub and walk-in shower share a continuous waterproofed space.
All-in bathroom budgets in Aurora
When you combine installation labour with your chosen porcelain or stone tile, vanity cabinet, countertop, faucets, toilet and tempered shower glass, most completed Aurora bathrooms fall into the ranges below.
Typical hall or guest bathroom
$14,000
Includes full installation labour together with mid-range porcelain tile, vanity and fixtures.
Full primary ensuite
$30,000+
Reflects larger room dimensions, 10 mm frameless glass, stone counters and plumbing moves.
Curbless accessible tub-to-shower conversion
$15,000
Based on our completed barrier-free walk-in shower conversions.
Price ranges by bathroom size and finish tier
Use the room-size table below to match your bathroom’s approximate dimensions with the level of finishes you plan to pick.
| Bathroom size | Finish level | All-in range |
|---|---|---|
| Small bathroomabout 5 x 8 ft | Straightforward refresh | $9,200 to $12,300 |
| Full rebuild with upgraded finishes | $18,500 to $22,600 | |
| Mid-size bathroomabout 10 x 10 ft | Standard porcelain and stock vanity | $12,300 to $14,400 |
| Upgraded tile, quartz and custom glass | $19,500 to $25,700 | |
| Custom cabinetry and layout changes | $25,700 to $30,900 | |
| Large primary bathroom or ensuiteover 10 x 10 ft | Practical finish selection | $14,400 to $18,500 |
| Mid-to-upper stone and glass | $18,500 to $25,700 | |
| Custom wet-room or high-spec build | $30,900 to $41,200 |
Labour and materials together, in CAD before HST. Updated November 7, 2026.
A compact 5 x 8 ft hall bathroom in a Regency Acres bungalow or a small condo bathroom along Yonge Street stays in the $9,200 to $12,300 band when the plumbing stays in the same footprint and you choose clean porcelain tile with a stock vanity. Rebuilding that same 5 x 8 ft bathroom with full-height porcelain slabs, a floating vanity, custom quartz and 10 mm frameless glass moves it into the $18,500 to $22,600 band. In a primary ensuite over 10 x 10 ft, stepping from the $18,500–$25,700 tier up to the $30,900–$41,200 tier typically reflects joist recessing for a curbless floor, relocated drain stacks, a freestanding tub filler and custom double cabinetry.
Individual trade and material line items
Every written quote we prepare breaks out individual tasks rather than lumping the whole job into a single number. Below are the common component prices Aurora homeowners ask about when planning a remodel.
| Item | Typical cost | Notes |
|---|---|---|
| Demolition, floor protection and disposal | about $1,500 | Taking the bathroom down to the studs, protecting hallways and hauling away debris. |
| Licensed plumber and electrician | $70 to $120 per hour | Electrical work is filed with the ESA; plumbing alterations require a Town of Aurora permit. |
| Recessed LED pot lights | about $250 each, installed | Wet-rated LED fixtures above showers and freestanding tubs. |
| Porcelain or stone tile (supply) | $10 to $100 per sq ft | Ranges from quality glazed porcelain up to natural marble or mosaic feature sheets. |
| Tile setting labour | $5 to $15 per sq ft | Varies with slab size, mitred edges, herringbone layouts and substrate prep. |
| Quartz or stone vanity top | $50 to $200 per sq ft, installed | Fabricated and fitted with undermount basin cut-outs. |
| Vanity cabinet | $500 to $1,500, plus $300 to $600 to install | Custom millwork or solid-wood double vanities generally start near $2,000. |
When you review estimates from different companies, pay close attention to two lines. First, check whether tile installation labour ($5 to $15 per sq ft) is separated from tile supply ($10 to $100 per sq ft); laying 2-inch hex mosaics or large 24 x 48 inch porcelain slabs takes noticeably more setting labour than standard field tile. Second, confirm that licensed plumbing and electrical work ($70 to $120 per hour) includes filing the Electrical Safety Authority notification. Our contractor vetting checklist explains what else to verify before signing.
Seven factors that shift your bathroom quote
Two bathrooms with identical floor dimensions can differ by $10,000 or more depending on what happens beneath the subfloor and which finishes you select.
Moving plumbing drains and stacks
Shifting a toilet drain, shower trap or tub supply requires subfloor framing access, new venting and a Town of Aurora plumbing and building permit.
Wall tile coverage and format
Tiling full height around the room, setting small mosaic sheets or handling large porcelain slabs increases setting time.
Curbless pans and frameless glass
Lowering floor joists for a flush entry and custom-tempering 10 mm glass panels add carpentry and glazier labour.
Vanity millwork, quartz and fixtures
Owner-selected cabinetry, stone tops, concealed thermostatic valves and floor-mounted tub fillers shape the material budget.
Framing and pipes in older Aurora homes
In 1960s Regency Acres bungalows or 1970s Aurora Highlands houses, opening the walls can expose soft subfloors, older copper shut-offs or unvented fans.
Condo board logistics
Low- and mid-rise buildings along Yonge Street or Wellington Street require management approval, elevator reservations and restricted work hours.
Permit and inspection requirements
Same-location fixture replacements avoid municipal permit fees, while new basement bathrooms or drain moves require Town of Aurora review.
The single biggest cost lever is whether your plumbing fixtures stay in their current spots. In the Town of Aurora, keeping the toilet flange, tub or shower trap, and vanity supply lines where they are avoids both subfloor framing work and the fee and review time of a municipal building and plumbing permit. When a builder-grade ensuite remodel requires moving a drain to replace a corner tub with a walk-in shower, we price the plumbing and permit steps clearly on their own lines so you can weigh the layout improvement against the exact cost.
How close can you get to a $10,000 bathroom renovation?
For site labour on a standard 3-piece hall bathroom, our 7 x 9 ft package is $8,000 and includes full demolition, a new alcove tub and 3-way shower bar, wall and floor porcelain setting, rough plumbing, a quiet exhaust fan, three recessed pot lights, a built-in vanity with quartz counter, and a sliding glass tub door. Once you add modest porcelain tile, a stock vanity cabinet, a reliable one-piece toilet and chrome faucets, the combined all-in total for a compact bathroom typically lands just above $10,000.
Four ways to keep an Aurora hall or guest bathroom close to that mark:
- Keep the toilet stack, vanity plumbing and tub or shower drain in their existing positions.
- Choose durable glazed porcelain ($10 to $15 per sq ft) instead of natural stone, tiling to the ceiling inside the tub or shower alcove while painting the dry walls.
- Fit a deep 60-inch alcove soaking tub rather than a freestanding tub that requires a floor-mounted filler; see bathtub replacement for options.
- Have every tile, faucet and cabinet selected before demolition starts so work never pauses waiting on back-ordered items.
The one layer we never cut to trim a budget is the bonded waterproofing membrane behind the shower walls and floor—it accounts for a small slice of the project cost and keeps water out of your framing and ceiling below.
Four common mistakes that cause bathroom budgets to overrun
Unexpected cost jumps on residential bathroom renovations almost always trace back to four avoidable pitfalls:
- Accepting a vague one-line quote. When an estimate simply states “complete bathroom renovation — $15,000” without naming waterproofing, fan ducting, pot lights or subfloor repair, missing items turn into costly change orders mid-job.
- Overlooking slow leaks in older houses. In 1960s Regency Acres bungalows or 1980s Aurora Highlands two-storeys, spongy flooring beside the tub or a faint stain on the ceiling below points to hidden water damage. Booking a targeted bathroom repair or setting aside a small subfloor contingency prevents surprises on demolition day.
- Changing fixture types after rough-in. Switching from a deck-mount faucet to a wall-mount faucet—or changing shower valve brands—after the plumbing and backer board are closed up means paying twice for the same wall.
- Tiling directly onto bare drywall. Skipping a bonded sheet or liquid waterproofing membrane saves a few hundred dollars during construction and costs thousands when damp grout rots the wall studs a few winters later.
One-day acrylic liners versus a down-to-the-studs renovation
Glue-on acrylic tub liners and wall surrounds are heavily advertised as a fast, lower-cost substitute for a real renovation. The table below compares what happens behind the surface.
| What is affected | Acrylic liner / wall cover | Full tear-out renovation |
|---|---|---|
| Old tub and wall board | Left in place and covered with moulded plastic sheets | Stripped cleanly down to the wood studs and subfloor |
| Trapped moisture or mould | Sealed behind the acrylic liner out of sight | Exposed, dried out and structurally repaired |
| Shower valve and drain trap | Existing valve and trap are often left untouched | New pressure-balanced or thermostatic valve and new trap |
| Tile, niches and bench options | Limited to stock acrylic patterns and glue-on corner shelves | Any porcelain or stone tile, recessed niches, built-in bench and 10 mm glass |
| Waterproofing protection | Relies on exposed silicone caulking seams | Continuous waterproof membrane bonded behind the tile |
If an alcove tub is solid, the walls behind it are completely dry, and you only want a quick cosmetic cover for a short-term rental, an acrylic liner can fill that narrow role. When a bathroom is 20+ years old, smells damp, or has cracked grout and soft drywall, a proper full bathroom renovation or tub-to-shower conversion solves the underlying problem instead of hiding it.
How Town of Aurora permits affect your renovation budget
Under the Town of Aurora Building Division’s published guidelines, you do not need a municipal building permit to repair or replace plumbing fixtures in the same location, swap bathroom cupboards without plumbing work, or install countertops, millwork and floor tile. A permit is required whenever you add fixtures, move drains or supply pipes, alter structural framing, or build a new basement bathroom. Source: Town of Aurora: Applications, Permits and Inspections (When are Permits Not Required?) (accessed November 7, 2026)
Keeping your existing plumbing layout means zero municipal permit fees and no review wait before demolition. Relocating a toilet stack or cutting concrete for a basement bath adds scaled PDF drawing preparation, the Town’s permit and plumbing fees, and scheduled municipal inspections before the walls are closed. Read our article on bathroom renovation permits in Aurora.
Milestone payment schedule and Ontario consumer rules
Before any work begins in your home, your written contract sets out a clear progress payment schedule tied to visible construction milestones completed on site—never a demand for most of the contract price up front. Under Ontario’s Consumer Protection Act, a written estimate included in a home renovation contract also limits the final charge to no more than 10% above the agreed estimate unless you approve additional or changed work in writing.
Federal and Ontario tax credits for barrier-free bathrooms
When a bathroom remodel includes accessibility modifications for a senior or a family member with a disability, two government tax credits may help reduce the net cost. Because eligibility depends on your personal tax return, always confirm the rules with the Canada Revenue Agency, the Ontario Ministry of Finance or your accountant.
- Federal Home Accessibility Tax Credit (Line 31285). A non-refundable federal credit covering up to $20,000 per year in eligible renovation expenses—such as a curbless walk-in shower, grab bars and fold-down seating—completed to improve safe access or mobility at home for a qualifying individual aged 65+ or eligible for the disability tax credit. Source: Canada Revenue Agency: Line 31285, Home accessibility expenses (accessed November 7, 2026)
- Ontario Seniors Care at Home Tax Credit. A refundable Ontario credit for eligible low- to moderate-income seniors aged 70 and older, reimbursing 25% of up to $6,000 in qualifying medical and home-safety expenses (up to $1,500 back). Source: Government of Ontario: Ontario Seniors Care at Home Tax Credit (accessed November 7, 2026)
Keep your itemized invoices and before-and-after photos with your tax records. Visit our accessible bathroom renovations in Aurora page to see how we build barrier-free showers.
Get a line-by-line written quote from your photos
Upload a few clear photos or a short walkthrough video of your bathroom—showing the doorway view, the tub or shower, the floor, the ceiling and the plumbing underneath the sink—and tell us what you want to update. We will prepare an itemized written quote that normally sits very close to the final contract price, then book an on-site measure and layout drawing visit once you like the numbers. Request your free quote or contact our Aurora team.
Aurora bathroom cost FAQ
Can a compact bathroom in Aurora be renovated for around $10,000?
On the labour side, yes: our 7 x 9 ft main-bathroom package is $8,000 and covers full demolition, setting a new alcove tub and 3-way shower bar, wall and floor porcelain, rough plumbing, an exhaust fan, three pot lights, a vanity with quartz top and a sliding glass tub door. Adding basic porcelain tile, a toilet, a tub and a stock vanity brings the all-in project total just over $10,000.
Why are finish materials priced separately from your labour packages?
Listing installation labour separately from finish materials keeps your quote completely transparent. You can pick a $10-per-square-foot porcelain tile or a $100 natural stone slab, and a $500 stock vanity or a $2,000 hardwood cabinet, while seeing the exact installation cost on its own line.
Which items account for the biggest share of a bathroom remodel budget?
On the labour side, building a waterproofed custom tiled shower with 10 mm frameless glass and trenching or re-routing subfloor drain pipes take the most trade hours. On the material side, custom double vanities, quartz countertops and concealed multi-outlet shower valves represent the largest line items.
What causes homeowners to blow past their bathroom renovation budget?
Budget overruns almost always trace back to four things: accepting a one-line estimate with vague allowances, changing fixture locations after rough plumbing is done, ignoring soft subflooring or attic-vented fans in older houses, or hiring an uncertified installer whose shower has to be redone.
How accurate is an itemized quote prepared from bathroom photos and measurements?
When you upload clear photos from the doorway, inside the tub or shower, underneath the sink cabinet and of the ceiling, our written photo quote is normally very close to the final contract total. We confirm every measurement and inspect site conditions in person before you sign and before any demolition starts.
How do progress payments work during an Aurora bathroom renovation?
Your contract sets out a clear, staged payment schedule linked to physical milestones completed in your home—such as rough-in completion, waterproofing and tile setting, and final fixture installation—rather than large upfront deposits. Ontario's Consumer Protection Act also caps unapproved contract overages at no more than 10% above the written estimate.
Is a one-day acrylic bath fit-over cheaper than a real tile and tub renovation?
An acrylic shell glued over your existing tub costs less on day one, but it seals any damp drywall, mouldy framing or aging brass shower valve inside the wall. Stripping the alcove to the studs lets us inspect the framing, install a new pressure-balanced or thermostatic valve, bond a real waterproof membrane and lay porcelain tile that lasts decades.